Wednesday, December 11, 2013

Renovation Day 103-123



The driving range bunker drainage and sand installation has been completed.  In the background of the pic you can see the irrigation system being blown out.  The compressor in the second pic was set up by the pump house.  We have to use a larger compressor to blow out the new HDPE system.  The system was blown out before the snow hit.  We are still making progress on tree work, we have a hand full of trees left. 

Followers