Monday, September 2, 2013

Renovation Day 17-20




A lot of progress has been made over the last few days.  The sand base for #5 green has been installed.  Once the bunkering and perimeter sod is in place we will start seeding the green.  Kye is floating the surface of #12 today and prep work around the perimeter is in progress.  Sod for the surround will arrive tomorrow.  The tie wall at #1 tee has been removed.  The soil from the demo at #9 green will be used as back fill to make a slight hill sloping down from the tee and hopefully allow us to gain a few yards in the front.  The asphalt and rock base is being removed in front of the pro shop for the new putting green site.  We are still well within the seeding window and I am looking forward to getting the surfaces seeded. 

No comments:

Post a Comment

Followers