#9 green and the new putting green in front of the pro shop has been drained, lined and filled with greens mix. Over the last few weeks of heat Mr. Goalby has been passing out water to the St. Clair, LaBar and T and A staff. He has been here every day since the beginning of the renovation, he even took my hose while I was watering sod so I could get a drink of water. Good Man. Also, Kye was out last Sunday in the rain floating the greens surface in preparation of seeding. The last picture is #1 with completed sod perimeter.
Thursday, September 12, 2013
Renovation Day 25-31
#9 green and the new putting green in front of the pro shop has been drained, lined and filled with greens mix. Over the last few weeks of heat Mr. Goalby has been passing out water to the St. Clair, LaBar and T and A staff. He has been here every day since the beginning of the renovation, he even took my hose while I was watering sod so I could get a drink of water. Good Man. Also, Kye was out last Sunday in the rain floating the greens surface in preparation of seeding. The last picture is #1 with completed sod perimeter.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment