Friday, August 16, 2013

Renovation Day 2



Kye dug up #1 green and the profile is pictured above.  There were two types of drainage and a useless gravel layer below the surface.  We began tree work on the left of #6 because it was close to the burn pile and easy enough to haul with the back hoe.  We are removing priority trees first and digging out stumps that are located in the new bunker areas.  The last picture is the completed herring bone drainage on #6 green.  The green also has three drainage outfall pipes so the water drains properly.  