Friday, August 23, 2013

Renovation Day 6-9



#1 green cavity is being filled with greens mix and irrigation has already been installed around the perimeter.  We are ahead of schedule and once the sod is installed we will be able to begin seeding the surface.  #5 green demo has started and judging by the other rebuilt greens we will be seeding early as well.  The last picture is of a capped irrigation line where the irrigation head connected.  We had to abandon the hydraulic line as well to maintain control of the irrigation system.  We didn't have controlable water on the course for 10 days and #15 green held in really well.  The 007 bent grass that we are seeding into the green surfaces throughout the course can really handle a lot of stress and I am still very impressed with its results.  

No comments:

Post a Comment

Followers